Project Cargo and Project Logistics

Project cargo, managed on a single schedule. Planning and managing multi-piece, multi-stage project cargo from port to site.

What we do

01

Port discharge and site delivery coordination

02

Route surveys and feasibility studies

03

Transport, lifting and storage on one plan

04

Shipment sequencing and site scheduling

05

Operations in Türkiye, Central Asia, the Middle East and Eastern Europe

01

Project cargo and project logistics

Project cargo is the stream of equipment, much of it heavy or out of gauge, that arrives to build a plant. Project logistics is everything around those moves: port discharge, interim storage, the dispatch sequence, unloading and lifting on site. If pieces do not reach site in the order the installation schedule needs, even a well-executed move can hold the project up.

We run project cargo with engineering support. Planning and analysis before the job is awarded are there to identify what could go wrong during the operation and to have the answer ready.

02

Port to site: managing the hand-overs

A piece of project cargo changes hands several times before it is installed: ship to quay, quay to truck, truck to laydown yard, back onto a truck and finally onto the crane hook. Every hand-over is a point where time is lost or damage happens, so in project logistics the transitions need planning as much as the moves themselves.

Because transport, cranes, storage and engineering come from one team, most of these hand-overs sit inside a single operating plan.

03

Route and feasibility come first

On any project the largest and heaviest pieces set the route. Which road they take from port to site, on which vehicle configuration and with which road modifications needs to be settled before the first shipment, or the problem tends to surface with the first heavy piece.

Our road survey team studies the route and reports the modifications it needs; on request we carry them out with our partners.

04

Dispatch sequence and coverage

The piece the installation crew needs has to be on site that day: early arrivals take up space, late ones keep the crane and crew waiting. The dispatch plan is therefore built on the site installation schedule rather than the packing list, and it is updated whenever the schedule moves.

Our coverage includes Türkiye, Central Asia, the Middle East and Eastern Europe.

Scope and scheduleImageImageImage

How the work runs

We treat project transportation as an operation tied to a plant's installation schedule, not as a single shipment. Planning and analysis before we accept a job help us anticipate problems during the operation, and our route survey team reports any required road modifications to the client.

0101

Scope and schedule

We review the cargo list, number of pieces, delivery sequence and the site installation schedule together.

  1. 01
  2. 02
  3. 03
  4. 04

What a first project conversation covers

Some of this may not be fixed yet. A draft is enough to start planning.

  • Cargo list: number of pieces, weights and dimensions
  • Port of discharge or supplier's works
  • Project site and site access
  • Installation schedule and delivery sequence
  • Interim storage needs
  • Crane or skidding work on site

Need this service?

Request a Quote

Ultrans

Share the cargo dimensions and weight, the origin and destination and your planned dates. Our team will review the requirement and get back to you.