Skip to main content
Ultrans crawler crane lifting a process module from a vessel at the quay

Project Transport · Heavy Haulage · Cranes

Heavy cargo,carefully planned.

Since 1993 we have worked in project transport, heavy haulage, cranes and dangerous goods. With a fleet ranging from cranes of up to 800 tonnes to 52 axles of Goldhofer hydraulic modular equipment, we plan, move and lift your cargo into place.

How We Work

Every operationstarts with the right plan.

Every load is different; our approach is the same. We survey, calculate and plan first, complete the permits, then carry out the operation under control.

Project cargo moved on hydraulic modules along a quay
  1. 01

    Survey

    We review the cargo specifications, route, site conditions and schedule on site.

  2. 02

    Planning

    We select the equipment and prepare the lift plan, axle load and route calculations.

  3. 03

    Permits

    We obtain road and site permits and arrange route modifications where needed.

  4. 04

    Transport

    The cargo travels on the planned route with the right vehicle and escort.

  5. 05

    Lifting & Installation

    Crane work follows the lift plan and the installation sequence.

  6. 06

    Handover

    The job is handed over once checks and documentation are complete.

1993Founded
331Reference projects
800 tCrane capacity
ISO9001 · 14001 · 45001 · 27001

Safety

Safety is the first step of every operation.

We treat health, safety and environmental requirements as part of the plan. No operation starts until equipment, driver, route and site suitability have been confirmed.

  1. 01 / 06

    Risk assessment

    For each operation we identify the risks arising from the load, ground, access and environment and assign a control measure to each.

  2. 02 / 06

    Method statement

    Lift configuration, rigging plan, exclusion zone, communication and stop-work criteria are set out in writing.

  3. 03 / 06

    Equipment checks

    Cranes and lifting gear are inspected before dispatch, and certificates and maintenance records are added to the job file.

  4. 04 / 06

    Site briefing

    The crew is briefed on the day, and no load moves until the plan has been checked against actual site conditions.

  5. 05 / 06

    Supervision

    The operation runs with an HSE specialist present; if anything departs from the plan, work stops and is reassessed.

  6. 06 / 06

    Records and improvement

    The job is closed out with records, and lessons learned feed into the next plan.

Our Offices

Across Türkiye,on site.

From our head office in Dörtyol and branches in Istanbul, Izmir, Marmaraereğlisi and İskenderun, we serve projects across Türkiye, Central Asia, the Middle East and Eastern Europe.

Head office and branches

  • Office

    Dörtyol

    Hatay

  • Office

    Istanbul

    Kadıköy

  • Office

    İzmir

    Aliağa

  • Office

    Tekirdağ

    Marmaraereğlisi

  • Office

    İskenderun

    Hatay

Ultrans

Let's plan your project together.

Share the cargo dimensions and weight, the origin and destination and your planned dates. Our team will review the requirement and get back to you.